Michael Peach helped out with some of the lame job of filling the vertical gaps between bricks. We got on a bit of a role with him doing that and me laying them. It was a lot easier to do with wider gaps between the bricks. This brick laying is going to take a long time.
517 became 516 when one of the bricks was deemed unsuitable for shack duties. Maybe it could still be suitable for ugly duties.
Wednesday, January 20, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment