Wednesday, January 20, 2010

23 / 516

Michael Peach helped out with some of the lame job of filling the vertical gaps between bricks. We got on a bit of a role with him doing that and me laying them. It was a lot easier to do with wider gaps between the bricks. This brick laying is going to take a long time.

517 became 516 when one of the bricks was deemed unsuitable for shack duties. Maybe it could still be suitable for ugly duties.

No comments:

Post a Comment